Links
-
Recent Posts
- feedback: Human-Machine Improvisations (Cork, 2010)
- acknowledgments: Human-Machine Improvisations (Cork, 2010)
- tonight! Human-Machine Improvisations (Cork, 2010)
- performance: Bruce Coates, Han-earl Park with Marian Murray
- shapes of io++ to come 05-23-10
- Irish Examiner: ‘Musical “robot” to play Blackrock Castle’
- RTÉ: Morning Ireland: Human-Machine Improvisations (Cork, 2010)
- portrait: io 0.0.1 beta++ 05-19-10
- reminder: Human-Machine Improvisations (Cork, 2010)
- shapes of io++ to come 05-17-10
Archives
- May 2010 (15)
- April 2010 (3)
- March 2010 (2)
- January 2010 (2)
- December 2009 (1)
- July 2009 (2)
- June 2009 (2)
- May 2009 (5)
- March 2009 (5)
- December 2008 (1)
- November 2008 (7)
- October 2008 (7)
- September 2008 (4)
- July 2008 (1)
- February 2008 (1)
- January 2008 (3)
Categories
- construction (38)
- performance (27)
- audio recordings (6)
- beta test (9)
- theory (10)
- website (5)
Tag Archives: software
software optimization vs. elegance
When started writing what became io 0.0.1 beta in ’99, having thrown out a whole bunch of old material, I made an effort to write elegant code. This was partly because of the complexity of this project (which would end up in the region of 25,000 lines of code), but also a reaction to the [...]
Posted in construction, software Also tagged 68000, 68LC040, construction, forth, HMSL, io 0.0.1 beta++, Phil Burk 2 Comments
source code 07-03-2004
For the record: source code for io 0.0.1 beta (rev. July 3rd 2004) [91kB zip file] and supporting components [198kB zip file]. Note that I have not differentiated components used by io and those that are not; I have included every file from the MyTools folder. Significant revisions since io 0.0.1 beta as detailed below. [...]
source code: io 0.0.1 beta
For the record: source code for io 0.0.1 beta [68kB zip file]. Note that this is only the io 0.0.1 beta specific files, I haven not included the auxiliary code in this archive. \ io \ \ load_io \ directory assignment and load file for io. \ \ see the file io_top for more information. [...]
schedule 0.0.1
Okay, let’s quickly revise the proposed timetable by shifting the start back by four months (i.e. to the present), deleting one of the breaks, repositioning the other, and see what we get. intermediate objectives (projected) initial design phase: january 2008– Software: design, preliminary implementation and testing of software components. Analog electronics: design and testing. alpha [...]
Posted in construction, hardware, schedule, software Also tagged construction, hardware Leave a comment
schedule 0.0.0
This is/was the timescale as proposed in the grant application. With the (then unforeseen) delays of the funding process, all this will need to be revised. intermediate objectives (projected) initial design phase: september 2007– Software: design, preliminary implementation and testing of software components. Analog electronics: design and testing. break: november 2007 alpha build: february 2008 [...]






hp->midi early report