Monthly Archives: January 2008

schedule 0.0.1

Okay, let’s quickly revise the proposed timetable by shifting the start back by four months (i.e. to the present), deleting one of the breaks, repositioning the other, and see what we get. intermediate objectives (projected) initial design phase: january 2008– Software: design, preliminary implementation and testing of software components. Analog electronics: design and testing. alpha [...]

Posted in construction, hardware, schedule, software | Tagged , , | Leave a comment

schedule 0.0.0

This is/was the timescale as proposed in the grant application. With the (then unforeseen) delays of the funding process, all this will need to be revised. intermediate objectives (projected) initial design phase: september 2007– Software: design, preliminary implementation and testing of software components. Analog electronics: design and testing. break: november 2007 alpha build: february 2008 [...]

Posted in construction, hardware, schedule, software | Tagged , , | 2 Comments

site launch

After the usual delays, Arts Council support in hand, here’s the launch of the io 0.0.1 beta++ site! (I expect the usual teething problems…)

Posted in website | Tagged , | Leave a comment